MIXED USE DEVELOPMENT PROJECT - KADUWELA

Kaduwela

1-1
6
6-1
3-2
PlayPause
1-1
6
6-1
3-2
previous arrow
next arrow
Shadow

Approx. LKR 4,020.34 Mn / 4.02 Bn

Estimated Total Project Cost

* Price escalations will be provided as per CIDA indices.
The Developer propose the selling price, no limitations from the USDA as the Employer.

Project Duration – 02 Years

Kaduwela is a town in the Colombo District, Western Province, Sri Lanka. It is located about 16 km (9.9 mi) from Colombo city centre on the Colombo – Avissawella Old Road (Low Level Road) and about 18 km (11 mi) from Kollupitiya on the New Kandy Road from Ethulkotte to Kandy.

LOCATION ADVANTAGE OF THE SITE

SITE DESCRIPTION

TECHNICAL DETAILS / PROJECT SCOPE

This intended mix-use development integrates multiple uses such as offices, commercial, and 108 affordable residential  units with following requirements and other ancillary facilities in the scope of works.

Floor level

Facility usage

Area calculation

Provisions and Remarks

Ground floor/ semi basement

Parking

Service facilities

Parking

Generator room  42.17sqm

Transformer room  23.15sqm

Garbage room  15.06sqm

Management office  14.69

Parking 58 cars

First floor

Parking

 

Parking 61 cars

Second floor & Third Floor

Offices Spaces

1,872.19 sqm

 

Forth- Twelfth floors

Housing

Total no.  of apartments  108

Total area of all apartments in one floor  959.51sqm

Approx. area of an apartment  79.75sqm

12 apartments

(2-bedroom) in each floor x 9 floors

 

SITE WEATHER

This is a conceptual design done by the USDA. However, the developer can propose any competitive design, fulfilling the USDA requirements and local guidelines.

This is only a conceptual design for the proposed location. However, the potential developer can propose a competitive design fulfilling the basic requirements stated by the Employer and adhering to the local guidelines.

The proposed design does not have to be limited to the existing design.

Price escalations will be provided as per CIDA indices

The Developer propose the selling price, no limitations from the USDA as the Employer.

Total Buildable area : 1111.2sqm/ 11960.86sqft
Land 2757sqm

usda

The Urban Settlement Development Authority (USDA),which was established in 2008 by Parliament Act No. 36 of 2008, is an institution functioning under the Ministry of Urban Development, Construction and Housing. The formulation of national policy in relation to urban settlement development and ensuring implementation of such policy, along with the provision of improvements to the living conditions of people in underserved settlements, are the interconnected twin objectives of the establishment of USDA.